Crow Island School
The diagrams above are conceptual and represent ideas developed during the Master Plan. They do not represent a design process or actual orientation of additions or renovations. Graphics are for illustrative purposes only. Here’s how to navigate this interactive graphic:
- Use the arrows in the TOP RIGHT corner of the image to toggle between floors.
- Click on each number in the images for Floors 1, 2, and 3 for more information about EMFP elements.
Crow Island School was designed by Eero Saarinen in partnership with Perkins + Will and is a National Historic Landmark. Click the button below to learn more about its historical significance.
0
Year Built
0
# Past Additions
0
Existing Square Footage
0
Current Optimal Capacity
Identified Long-Range Needs
Building Needs
Baseline
$10,547,187
Renovations
$11,704,500
Basement:
Rehabilitate Classrooms
Re-purpose LRC as Cafe/Collaboration Space
First Floor:
Preserve Historic Classroom Finishes
Preserve Admin Area
Preserve Auditorium
Rehabilitate Gym
Expansion/Additions**
$11,607,608
Kinetic Wellness Addition
Classroom Additions (3 rooms)
**locations TBD
Site Needs
Storm Water Detention
$562,500
*The above items are listed with the Order of Magnitude Cost Estimate (OME) and site work allowance associated with the work.